The main WPP buildings and facilities are: wind turbines, electric substation, control unit and road infrastructure.
WPP comprises 30 wind turbines 3 MW each. A wind turbine is a propeller-type structure. The main elements of a wind turbine are: a tower, a wind wheel, a brake system, a power generator and an anti-icing system. The tower height is 100 meters; the wind wheel diameter is 101 meters. All wind turbines are connected with a 110 kV step-up substation by cable lines; generated electricity is directed there. The step-up substation is connected with the unified energy system by power lines.
The average annual output will total 244 m kWh/year. Annual CO2 emissions will reduce by 116,000 tons as compared to a similar output at thermal power plants. Annual reduction in fossil fuel will be 90 m Nm3 of gas or 70 tons of fuel oil. Lifetime of the wind farm will be 20 years. The staff number employed at the WPP will be 27 people.
The diameter of the land allotment under each wind turbine will make a circle not wider than 30 meters. The land between wind turbines is free and can be used for grazing and other purposes.
The project envisages use of modern wind turbines, which meet all the latest international safety standards. Their design provides for safe operation during hurricane winds up to 60 m/s. Wind turbines do not have an adverse noise impact on the environment due to slow speed of the blades (2–3 revolutions/min). The noise from the working wind turbines in 300 meters distance does not exceed 35 dB whilst an acceptable noise level for residential area in the daytime is 55 dB and 45 dB — at night.
WPP is designed in accordance with the rules and laws of the Russian Federation with approval of project documentation by Glavgosexpertiza.
January: | — | Presentation of the investment idea at the municipal administration for Temryuksky district, Krasnodar region |
---|---|---|
February: | — | Selection of a potential site for a wind farm construction |
March: | — | Business plan for a wind farm construction is ready. EMIS for municipal unit Temryuksky district approved WPP construction |
April: | — | Draft a declaration of intent for investment in WPP construction is developed |
May: | — | Surveying works on the WPP site of wind are performed |
June: | — | Tender for provision of on-site annual wind monitoring |
July: | — | Geotechnical investigations of the first phase plot of land are completed |
August: | — | A historical and cultural survey of the first phase plot of land is completed |
September: | — | Public hearings on changing the master plan of the area are conducted. The tripartite agreement of intent for the Project implementation is signed with Administration of Krasnodar region and Temryuksky district municipal unit |
October — December: | — | Coordination of issues having to do with capacity output scheme and changes to the master plan of the area |
January: | — | Safety Impact Assessment of the met mast on the flights safety is designed |
---|---|---|
February: | — | Agreement with Siemens AG for the Project is signed |
March: | — | The change of the area master plan is approved |
April: | — | Terms of reference for development of a capacity output scheme with Kubanenergo, supervisory control (ODU) of the South and main power transmission lines (MES) of the South are coordinated |
May: | — | Start of the wind measurement campaign |
December: | — | The positive decision about realization of Project was obtained from administration of Krasnodarskiy region |
February: | — | The application for an act of choice land was filed |
---|---|---|
March: | — | Capacity output scheme of wind farm approved by LLC "Rosseti", LLC "Kubanenergo", LLC "SO UPS" (ODU South) and LLC "FGC UES" |
May: | — | Wind measurement of Beregovaya wind farm was successfully done |
August: | — | The Project has been included in Strategy of development of Russian electricity system for 2014—2020, Decree of Ministry of Energy RF #495 from 08/01/2014 |
October: | — | The general layout for WTGs is alaborated |
December: | — | The Rules of land use and land development were changed |
May: | — | Two-years wind measurement campaign of Beregovaya was successfully done |
---|