The wind measurement campaign was finished at the site of Beregovaya wind farm on 2nd of May 2014. The wind measurement was done for investigation of wind potential of the site. Under results of the wind measurement we can preliminary say about good efficiency of a wind farm. Final findings and conclusions will be prepared by GEO-NET in the coming months. So to be prepared an annual report with the status of "bankable", micrositing and energy yield.